建于20世纪20年代, Union Station is not only a heritage landmark — it’s also the highest volume multi-modal transportation hub in the country, accommodating 20 million passengers annually and connecting to the city’s subway, 区域, 国家铁路网络. Critical upgrades were required to modernize aging infrastructure, and construction needed to be staged in ways that minimized day-to-day disruption for the endless flow of passengers who rely on its access points.
IBI Group is involved in two key phases of the project:
第二个平台
IBI Group is leading the $180 million modernization of the Union Station TTC Subway terminal to meet the modern transit ridership’s expectation of how a station should look and perform. This includes the addition of a new second platform to the south side of the subway, 对现有平台进行升级, and doubling the size of the concourse level area above.
All interior finishes will be completely replaced, and floor to ceiling glass installations at all fare lines will create a brighter environment with new elevators, 自动扶梯, and wider stairs designed to improve access and circulation from and to platforms. 作为AECOM的分包顾问, IBI Group provided the design and contract documents for the subway station addition/renovation, and is also involved with the contract administration of the project.
振兴
与NORR有限公司合作, IBI Group also provided civil engineering and consulting services to support Deloitte’s Development Advisory 服务 study of development options within Union Station. 我们的职责包括:
- Design and approval of storm and sanitary sewer connections, 水连接用于保护, 施工文件
- Design of the re-routed Ø1050mm combined sewer as an inverted siphon, 完整的进口和出口结构
- Design of pumping station to drain and siphon; obtain MOE approval; contract documents; and preparation of maintenance manuals